Coast to Coast Marine Installations, LLC
Tel 321-525-9369
  • Home
  • About
    • Bow & Stern Thrusters
    • Hydraulic Swim Platforms
    • Fold Out Chocks
  • Contact
  • Home
  • About
    • Bow & Stern Thrusters
    • Hydraulic Swim Platforms
    • Fold Out Chocks
  • Contact

HYDRAULIC SWIMPLATFORMS

Picture
Picture
A typical hydraulic swimplatform installation usually takes ±20 hours or 2-3 days depending on the yard hours the vessel is located in during the installation. Other installations can take longer depending on the accessibility of the vessel's interior and the complications of the electrical components and wire runs. That being said an installation can easily be accomplished in between weekends during your boating season and yes “Your vessel needs to be out of the water whether you are having a thruster, hydraulic swim platform, or both installed”.

70' Viking Swim Platform
Picture
Picture

Custom Swim Platforms
Here is a small selection of custom swim platforms we have built. There are three photos each of platforms for a 95' Viking, a 75' Azimut, and a 68' Azimut. All three were built from scratch, by hand, without a mold. The only wood in them is the teak decking you see. These platforms are 16-18' long and 4½-5' wide. The Azimuts have a 4" radius along the top edge and both Azimuts have their teak decks recessed in the fiberglass.
Picture
75' Azimut swim platform.
Picture
68' Azimut swim platform.
Picture
95' Viking swim platform.
Picture
75' Azimut swim platform.
Picture
68' Azimut swim platform.
Picture
95' Viking - skirt recesses are for lights.
Picture
75' Azimut swim platform.
Picture
68' Azimut swim platform.
Picture
95' Viking - being crated for shipping.

Picture
Picture


Home
About
Contact
COAST TO COAST MARINE INSTALLATIONS, LLC
Cape Canaveral, FL 32920
Tel: ​321-525-9369

www.c2cinstalls.com
Copyright © 2015 Coast to Coast Marine Installations